Harold Bunger & A.V. Henry Building

  • Completed: 1964
  • Construction Cost: $2,998,000.00
  • Square Feet: 151,265
The Harold Bunger & A.V. Henry Building was built in 1964 for $2,998,000 and is a total of 151,265 Square Feet. The facility is utilized by College of Engineering students.
▼ read more ▼ ▲ read less ▲
Honorary- Bunger began at Georgia Tech as an instructor in 1927 and promoted to head of the Chemical Engineering department in February 1940. Bunger had been involved in the creation of Georgia Tech's Engineering Experiment Station. After its first director left, Bunger was named acting director of the station.

Harold Alan Bunger and W. Harry Vaughan

Bunger began at Georgia Tech as an instructor in 1927 and was promoted to head of the Chemical Engineering department in February 1940. Bunger had been involved in the creation of Georgia Tech's Engineering Experiment Station after its first director, W. Harry Vaughan, left for a higher-paying job at the Tennessee Valley Authority in December 1940. Bunger was named acting director of the station after Vaughan. Less than a year later, Bunger died suddenly on August 15, 1941 while visiting Minneapolis, Minnesota.